In September 2026, a power plant in rural Utah did something no plant had done before: it made grid electricity from hot rock that had no natural reservoir, using drilling methods borrowed from the fracking boom. Weeks earlier, Google had signed the biggest deal ever for this kind of power. Here's what enhanced geothermal is, how it works, why Big Tech is betting on it, what it costs and how its tax credits work.
QUICK ANSWER
Enhanced geothermal, or enhanced geothermal systems (EGS), makes 24/7 carbon-free electricity by drilling into deep, hot rock, fracturing it and circulating water through it, using techniques borrowed from oil and gas. Fervo Energy's Cape Station in Utah became the first utility-scale EGS plant to reach first power in September 2026.
KEY FACTS
What does EGS stand for? Enhanced geothermal systems, a way to make geothermal power without a natural hot water reservoir.
Is enhanced geothermal the same as fracking? It borrows fracking's drilling and rock-fracturing methods, but it circulates water to collect heat instead of extracting oil or gas.
Where is Fervo's Cape Station? In Beaver County, Utah. Its first 33 MW unit reached first power on September 24, 2026.
Who is buying enhanced geothermal power? Southern California Edison, Google (a 396 MW deal) and Meta, among others.
How much does enhanced geothermal cost? About $7,000 per kW at Cape Station, per Fervo's IPO filing, with a $3,000 per kW target.
Does enhanced geothermal get the investment tax credit (ITC) or production tax credit (PTC)? Either. Owners choose the Section 48E ITC or the Section 45Y PTC, both at full value for construction starting through 2033.
Is geothermal renewable? Yes. It uses the Earth's heat, which is constantly replenished, and emits almost no carbon.
What is enhanced geothermal?
Enhanced geothermal, or enhanced geothermal systems (EGS), makes electricity from the heat in deep, hot rock that has no natural underground reservoir of water. Developers borrow oil and gas drilling and fracking techniques to crack the rock, pump water through it and bring the heat back up to run a turbine, 24 hours a day.
Conventional geothermal only works where hot water or steam already sits close to the surface, which limits it to a few spots in the West. Enhanced geothermal aims to make the reservoir instead of finding one. That could open up hot rock across much of the country, which is why the U.S. Department of Energy calls it "next-generation geothermal."
The idea is decades old. What changed is drilling. Shale drillers learned to bore long horizontal wells and fracture rock cheaply, and geothermal startups like Fervo Energy are now using the same rigs, crews and methods to reach heat.
How do enhanced geothermal systems work?
An enhanced geothermal plant drills two or more wells deep into hot rock, often around 10,000 feet down and then horizontally. Crews fracture the rock between the wells, pump cold water down one well, let it heat up as it flows through the cracks and bring it back up through the other well to make power.
At Fervo's Cape Station in Utah, wells go about 10,000 feet down and then run about 7,500 feet sideways, and the water comes back above 400°F, Fortune reported. The hot water passes through a heat exchanger that boils a second fluid, which spins the turbine. The cooled water then goes back underground in a closed loop.

Because the heat never stops, an enhanced geothermal plant can run around the clock like a gas or nuclear plant, without fuel or carbon emissions. That "firm" output is what separates it from wind and solar.
How is enhanced geothermal different from conventional geothermal?
Conventional geothermal taps natural pockets of hot water or steam, so it only works in rare locations. Enhanced geothermal creates its own reservoir in hot, dry rock, so it can work in far more places. Both make steady, carbon-free power.
Today's U.S. geothermal fleet is almost all conventional. It produced about 16 billion kilowatt-hours in 2025, roughly 0.4% of U.S. utility-scale electricity, from plants in seven states, according to the U.S. Energy Information Administration (EIA). California made 68.6% of that power and Nevada 24.7%.

Enhanced geothermal could change that map. The DOE's GeoVision analysis says U.S. geothermal could reach 60 gigawatts by 2050, about 8.5% of U.S. generation, and a 2023 Enhanced Geothermal Shot analysis put the potential at 90 GW. For the heat pump side of geothermal, see our guide to geothermal energy tax credits.
What is Fervo Energy's Cape Station?
Cape Station is Fervo Energy's enhanced geothermal project in Beaver County, Utah, and the first utility-scale EGS plant in the world to reach first power. Its roughly 100 MW first phase began sending power to the grid in September 2026, with about 400 MW more under construction for 2028.
Phase I uses three 33-megawatt units Fervo calls GeoBlocks. The first came online on September 24, 2026, and Fervo is ramping up the rest of the phase through the end of the year. Phase II adds eight 50 MW GeoBlocks, and a third phase would bring the site to about 900 MW. Southern California Edison is the primary customer for the first phase.

Fervo went public on Nasdaq on May 14, 2026, under the ticker FRVO, raising about $2.2 billion at $27 a share, according to its first-quarter results release. It also closed $421.4 million of project financing for Cape Phase I and signed an agreement with Liberty Mutual to monetize the project's tax credits. Use the interactive chart below to compare Cape Station with the rest of the geothermal market.
Phase I: about 100 MW from three 33 MW GeoBlocks. The first reached first power in September 2026.
Sources: Fortune (September 24, 2026); Fervo Energy Q1 2026 results; Quartz via Yahoo Finance (September 1, 2026); Canary Media (April 2026). The dashed orange line marks Google's 396 MW contract.
Why are Google and Meta betting on enhanced geothermal?
Big Tech needs clean power that runs 24/7 for AI data centers, and enhanced geothermal is one of the few sources that can deliver it. In September 2026, Google signed a 396 MW deal for Cape Station power, the largest enhanced geothermal power purchase agreement on record. Meta has signed two 150 MW deals.
Google's September 1, 2026, agreement would supply a potential Utah data center, with an option to add about 600 MW by June 2030, bringing it close to 1 gigawatt, Quartz reported. Google had already signed a framework with Fervo in March 2026 covering up to 3 GW of geothermal capacity through 2033. In November 2026, Google also agreed to buy 50 MW of superhot geothermal power from Quaise Energy in Oregon.
Meta has backed two newer approaches: 150 MW from Sage Geosystems, announced in 2024, and 150 MW from XGS Energy for its New Mexico data centers, announced in June 2025, Utility Dive reported. For more on how data centers are reshaping power deals, see our guide to data center fuel cell costs.

How much does enhanced geothermal cost?
Enhanced geothermal is still expensive. Fervo's IPO filing put Cape Station at about $7,000 per kilowatt of installed capacity, and the company is targeting $3,000 per kW. Fervo says it cut drilling times by about 75% and per-foot drilling costs by about 70% between 2022 and 2025.
Those figures come from Canary Media's review of the filing. At $7,000 per kW, a 100 MW geothermal power plant costs about $700 million before financing. Fervo guided to about $1.2 billion in total capital spending from the second quarter of 2026 through the first quarter of 2027 as it builds Phase II.
The economics depend on two things: how fast drilling costs keep falling and how much of the cost federal tax credits cover. That's why the credit choice below matters so much for any geothermal project.
Does enhanced geothermal qualify for tax credits?
Yes. Enhanced geothermal plants can claim the Section 48E investment tax credit (ITC), worth 30% of eligible cost with prevailing wage, or the Section 45Y production tax credit (PTC), worth 3.1 cents per kilowatt-hour in 2026 for 10 years. Both stay at full value for construction starting through 2033.
The One Big Beautiful Bill Act cut wind and solar credits but spared geothermal. Geothermal plants keep the full credit for construction starting through 2033, then 75% in 2034 and 50% in 2035. They aren't subject to the wind and solar placed-in-service deadline of December 31, 2027, though prohibited foreign entity rules do apply. Our Section 48E guide and Section 45Y guide cover the details.
Because geothermal plants run most hours of the year, the PTC often beats the ITC, but high drilling costs can tip it the other way. Our ITC vs. PTC guide explains the tradeoff. Either credit can be sold for cash under Section 6418, and the Senate's permitting reform bill includes a geothermal title that would speed leasing and drilling permits. Use the calculator below to compare the two credits for your plant.
A 100 MW enhanced geothermal plant at $7,000 per kW costs about $700.0M. The ITC is worth $210.0M up front, or about $191.7M if sold. At a 90% capacity factor it makes about 788,400 MWh a year, so the PTC pays $24.4M a year and $244.4M over 10 years, worth about $152.5M today at 8% if sold. The ITC comes out ahead. Dashed outlines show the full credit before discounting and sale price.
Illustrative estimate. PTC held at the 2026 rate (it rises with inflation), ITC basis assumed equal to installed cost, and the capacity factor and discount rate are your own assumptions. Eligibility, prohibited foreign entity rules and credit prices vary by project. Not tax advice.
What are the pros and cons of enhanced geothermal?
Enhanced geothermal's biggest advantages are round-the-clock carbon-free power, a small land footprint and no fuel costs. Its drawbacks are high up-front costs, drilling risk, the chance of small earthquakes from fracturing rock and the water needed to run the loop.
Pro: firm power. It runs day and night in any weather, which makes it valuable to grids and data centers.
Pro: borrowed know-how. It uses the oil and gas industry's rigs, workers and supply chains.
Con: cost. First-of-a-kind plants cost far more per kilowatt than solar or gas plants.
Con: induced seismicity. Fracturing and injecting water can trigger small earthquakes, so projects need monitoring plans.
Con: drilling risk. A well that comes in cooler or less productive than planned cuts output and revenue.
Is enhanced geothermal the future of clean energy?
It could be a big part of it. At COP31 in November 2026, governments and companies backed a goal of growing geothermal energy 12 times over by 2050. Global geothermal power capacity would rise from 15.6 GW in 2025 to about 193 GW, based on IRENA analysis.
The Global Geothermal Ambition 2050 pledge, launched by the Turkish COP31 Presidency with IRENA, says next-generation drilling can bring geothermal to countries once considered unsuitable for it. The European Union signed on in November 2026, Balkan Green Energy News reported.
In the U.S., the DOE says permitting reforms alone could double geothermal capacity by 2050. If Cape Station keeps ramping and drilling costs keep falling, enhanced geothermal could move from one Utah valley to a meaningful share of America's always-on clean power.
Sources
U.S. Energy Information Administration, Use of geothermal energy (2025 data)
Fervo Energy, first-quarter 2026 results (SEC Exhibit 99.1, June 2026)
Fortune, Fervo brings the first next-gen geothermal power to the grid (September 24, 2026)
Canary Media, Fervo Energy unveils new power plant details in IPO filing (April 2026)
Utility Dive, Meta and XGS Energy announce geothermal deal (June 2025)
COP31 Presidency, Global Geothermal Ambition 2050 pledge text (November 2026)
Balkan Green Energy News, EU signs up to COP31 Global Geothermal Ambition 2050 (November 12, 2026)
IRS, Internal Revenue Bulletin 2026-41 (Notice 2026-47, 2026 Section 45Y rates)
Frequently Asked Questions
Is enhanced geothermal safe?
It is generally considered low risk, but fracturing rock and injecting water can cause small earthquakes, known as induced seismicity. Developers monitor seismic activity and adjust operations, and regulators can require seismic monitoring plans.
Can you invest in enhanced geothermal?
How long does an enhanced geothermal plant last?
Why does enhanced geothermal matter for data centers?
Can Cenet Capital help with geothermal tax credits?
Building or buying geothermal power?
Cenet Capital helps geothermal developers and owners value their Section 48E and 45Y tax credits, choose between the ITC and PTC, and sell the credits to corporate buyers for cash. Share your project size, location and timeline, and we'll show you what your credits could bring in.